Networking, Security & Cloud Knowledge

Friday, August 24, 2018

Expanding exiting 3650 stack.


Following document explain procedure to expand existing 3650 stack.

 #############################################################

Pre-deployment activity:

1 Backup configuration of existing stack.

2 Verify existing stack status using.
  • show switch : Ensure all switches are in ready state and have appropriate priority set.
  • show inventory
  • show version
  • show run | inc provision


3.     Identify the number < Switch Number>  which should be given to switch that will be added in existing stack.

4.     Provision new switch on existing stack using configuration command.
  • Switch  < Switch Number>   provision 
  • Verify status using – ensure new switch is in provisioned state
  • Save the configuration.


5.      Ensure auto-upgrade is enabled on existing stack ( global configuration command)
         software auto-upgrade enable

6.      On new switch, in case old switch is re-used erase the configuration.

7.      By default switch will number to 1 / switch 1. Renumber this switch to new number.
  • Switch 1 renumber < Switch Number>  
  • Reload the switch.


8.      After reboot verify switch configuration / setting.
  • Show switch



9.      Provision switch 1 on new switch.

10.  Stack new switch

11.  Power on stack ( it might take 15 – 20 minute for new switch become member of existing stack.

12.  Verify stack.

13.  Set stack priority for new member in stack.

14.  Save the configuration.